To order your 2 Day Quick Ship Office call 1-800-636-3873

Panel Built, Inc. will deliver a Value Line Modular Office in 2 Business Days
The new “Quick Ship” program at Panel Built brings you lightning lead times on our Value Line modular office systems. You can now have your basic Value Line office ordered, manufactured and shipped within two business days of receipt of your purchase order.
Our Sales and Engineering Teams will work to get you a free quote and drawing fast, so you can approve and order your project and get it into production.
Our Quick Ship products are manufactured with the same quality and attention to detail we give all of our products, but we now have systems in place to accelerate the process.
Of course our support for your project doesn’t end when we ship it. Our quality assurance program will make sure you are completely satisfied with your Panel Built office.
General Requirements
• 8’ or 10’ Walls
• 8’ x 8’ up to 20’ x 40’ (2’ increments)
• Standard Vinyl Covered Gyp/Gyp Panels with Polystyrene Core
• Same Color Vinyl Both Sides
• Doors & Trim to Match Walls
• B-Deck Roof
Standard Options
• 3-0 or 6-0 by 7-0 Doors
• ¼” Clear Tempered Glass Windows (4’ x 3’ only)
• Standard HVAC Unit
• 2’ x 4’ Drop Ceiling
• 6” Batt Insulation
• Standard Electric (duplex receptacles, switches, data, troffer lights)
HVAC Options (Through Wall & Heat Pump)
• Amana 9,300 BTU Cooling / 11,000 BTU Heating
• Amana 12,000 BTU Cooling / 11,100 BTU Heating
• Amana 18,000 BTU Cooling / 11,100 BTU Heating
Color Options
• Champagne
• Grey
• White
Freight Options
• LTL Carrier
• Customer Pick-Up
Standard lead times will apply to special colors or non-standard doors, windows and wall heights. Ask your Sales Representative if your project qualifies for Quick Ship.
|
Featured Stories: |
|
February 10, 2012
Panel Built attends Modex 2012Manufacturers and distributors from all over the country, many of ... |
|
January 24, 2012
Understanding Modular Fire Wall Classifications
There are many different levels of fire rating, and in ...
|
|
January 2, 2012
Make the Most of a New YearA New Year means new opportunities, and for many that ... |
|
December 22, 2011
Modular Walls for a Good CauseBlairsville resident Paul Holliday is a man on a mission. ... |
|
December 20, 2011
2-Day Quick Ship for In-Plant Modular Office BuildingsIt’s that time, again! The end of 2011 is in ... |
|
November 2, 2011
New Lift-out Barrier Rail SystemPanel Built is manufacturing a new type of barrier rail. ... |











