2014 Stories
News Stories For 2014
September 15, 2014Panel Built Safety

At Panel Built we hold safety at the utmost importance. So far this year we have had only one minor injury and no lost time accidents. …

September 10, 2014Bowling Extravaganza 2014

Panel Built recently celebrated our annual bowling party on September 5th as a great ending to our Lablr Day Week. Though not everyones sport, the staff …

June 2, 2014Fiscal Year End Party

It’s that time a year a again when we look back on the fiscal and year and review all we have accomplished. This year to commemorate …

May 8, 2014Modular Vs. Conventional Construction

Modular building has been described as ‘the creation of discrete volumetric sections of a building’, which are then transported to a site 80%-90% complete and assembled …

April 24, 2014Portable Building – Used for More than Construction

Portable buildings are essential ingredients in effective construction efforts in theUnited States. They are used for many purposes, one of the most important of which …

April 24, 2014Modular Vs. Stick Built

Historically, the most common method of construction has been “stick built”. Raw materials are shipped in, cut to size, and assembled on site. This construction method has …

March 18, 2014What You Need To Know About Modular Construction

Not every new building comes with a dream office.  Depending on what type of building being moved into or business being run, sometimes a specialized type …

March 6, 2014GSA Teaming Agreements

What is a GSA Schedule Contractor Team Arrangement (CTA)?  A GSA Schedule Contractor Team Arrangement (CTA) is an arrangement between two or more GSA Schedule contractors to work …

January 6, 20142013 Chirstmas Party

Panel Built celebrated another successful year on December 20th at the Union County Community Center with the annual Christmas party. Many were already away with their …

Call For Modular Building Solutions 800.636.3873