SPRINKLER PACKAGE: EACH

The sprinkler package shall include sufficient quantity of 165 or 212 degree heads placed no more than 7’6″ from any wall, with coverage of approximately 130 square feet, with Schedule 40 Black Pipe. The complete fire sprinkler package shall meet the latest edition of the NFPA. The sprinkler system shall be fabricated as to adapt to existing fire sprinkler system at no more than two riser locations. Fire sprinkler tie-ins shall be brought to the perimeter of the modular structure. Final connection shall be made by others.

Call For Modular Building Solutions 800.636.3873