Gallery

Project of the Month

Winners

Quick Contact

July Project of the Month 2017

 

Project of the month

 

July’s Project of the Month goes to this modular office system installed in Rock Hill, South Carolina for 3D Systems, a computer systems manufacturer. The project consisted of two modular office buildings: one single story and another two story.  The two story office building will be used as a break room for plant workers on the bottom, while the second story will be housing cubicles, providing a large amount of office space.

 

With the 25’x66′ two story office and the 20’x25′ single story, this modular office project provides 3800 square feet of office space.  The structures replace 3D’s previous, unenclosed break area with a far more controllable environment that provides cooler temperatures and sound dampening.  This project was sold through Harris Handling’s Tom Currier.

 

Office Interior

 

Elevated Modular Office